What Happens When You Get Solar Panels Installed?

4 Minute Read
A JellyWatt installer walking up a tiled roof on install day
From the first call to switching it on, this is what happens when you have solar panels and a battery fitted, and what you need to do along the way.

A lot of people tell us the install itself is the part they worry about. Scaffolding, people on the roof, the power going off. It is much simpler than it sounds.

This is how a solar and battery install works with us, step by step.

Key Takeaways

  • Most of the work happens before install day. The survey and design decide how well your system works.
  • Most homes take one or two days on the roof. Your power is only off for a short part of that.
  • The paperwork is ours to do. Grid notification, MCS certificate and building regulations sign off.

1. A Call To Talk It Through

We start with a short call. We ask about your bills, how you use power and what you might add later, like an electric car or a heat pump. If solar is not a good fit, we will tell you.

2. A Survey At Your Home

Next we visit. We look at the roof, the timbers, the fuse board and where an inverter and battery could go. We also check for shading from trees, chimneys and nearby buildings.

3. Your Design And Proposal

We design the system around your roof and your usage, then send you a written proposal that explains what we recommend and why. You take your time to decide.

4. Grid Paperwork

Every system has to be registered with your local network operator. Smaller systems are notified after they go in. Larger systems need approval first, so we apply before install day and tell you where it stands.

No items found.

5. Scaffolding Goes Up

The scaffold usually goes up a day or two before we arrive. It keeps the team safe and protects your roof and garden.

6. Install Day

We fix the mounting rails to the roof, then the panels. Inside, we fit the inverter and battery and run the cables. Your power goes off for a short time while we connect everything to your fuse board, and we will tell you when.

7. Testing And Switch On

We test the whole system, switch it on and set up your monitoring app. Then we show you how it all works, what the lights mean and how to see what your roof is making.

8. Your Certificates

You get an MCS certificate, which you need to be paid for the power you export under the Smart Export Guarantee. We also register the work for building regulations. Keep these with your house documents. Read more about solar and battery warranties.

9. Aftercare

The scaffold comes down and the system starts working for you. If anything looks wrong in the app, you call the same team that fitted it.

What You Need To Do

  • Clear a path to the loft and the fuse board on install day.
  • Let us know about pets, parking and anyone working from home.
  • Apply for a Smart Export Guarantee tariff once your MCS certificate arrives.

Talk It Through With Us

We are a small team based in Frome. Not sure how many panels you need? Our guide on how many solar panels a home needs is a good start. Read more about our solar panel installation, or book a discovery call. No pressure. Just clear advice.

If you have any questions, please give me a call on 07782 246447.

Close-up of solar panels installed on a rooftop under cloudy sky.